The municipality A4 Zone West C.V. wishes to prepare the Imagination Avenue and the intersections with Airborne Avenue and Circular Avenue by performing a preloading operation, so that the actual construction of the roads and intersections causes minimal disruption at a later stage. After the preloading, it will be removed and the roads and intersections will be constructed according to the attached specifications. The contract concerns an open procedure for road construction works. The contractor must realize the preloading, its removal, and the subsequent construction of the roads and intersections, taking into account the requirements in the specifications, safety, traffic continuity, and minimal impact on the surroundings.

Works · Open · European procedure

European
Contracting authority
Contract type
Works
Open
Estimated value
€2,207,000
estimated value
Submission deadline
Ongoing
16:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
SCHIPHOL
CharacteristicsCPV 45WorksEU tenderintersectionsavenuesroad construction

01What is being requested

The municipality A4 Zone West C.V. wishes to prepare the Imagination Avenue and the intersections with Airborne Avenue and Circular Avenue by performing a preloading operation, so that the actual construction of the roads and intersections causes minimal disruption at a later stage. After the preloading, it will be removed and the roads and intersections will be constructed according to the attached specifications. The contract concerns an open procedure for road construction works. The contractor must realize the preloading, its removal, and the subsequent construction of the roads and intersections, taking into account the requirements in the specifications, safety, traffic continuity, and minimal impact on the surroundings.

GEM A4 Zone West C.V. has preloaded the Imagination Avenue and the intersections with Airborne and Circular Avenue to minimize future settlement to a minimum. After this phase, the preloading will be removed and the roads and intersections will be constructed. The works are described in the present specifications.

45000000€ 2,21MWorks
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

€2,207,000

04Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Den Ouden Aannemingsbedrijf B.V.SME9723×
3Heijmans Infra B.V.SME9665×
4Combinatie Heijmans - SWARCOUnknown9573×
5BAM Infra B.V.SME9577×
6Van Gelder BVSME9553×

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific scope of the works for the Imagination Avenue?
The contract includes performing a preloading on the Imagination Avenue and the intersections with Airborne Avenue and Circular Avenue to minimize future settlement. After the preloading, it must be removed, after which the roads and intersections will be constructed.
Which aspects must be taken into account during the realization of the roads and intersections?
During the execution of the works, account must be taken of the requirements regarding safety, traffic continuity, and limiting the impact on the surroundings.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
€ 2,2 mln