Construction of Avenues intersections
The municipality A4 Zone West C.V. wishes to prepare the Imagination Avenue and the intersections with Airborne Avenue and Circular Avenue by performing a preloading operation, so that the actual construction of the roads and intersections causes minimal disruption at a later stage. After the preloading, it will be removed and the roads and intersections will be constructed according to the attached specifications. The contract concerns an open procedure for road construction works. The contractor must realize the preloading, its removal, and the subsequent construction of the roads and intersections, taking into account the requirements in the specifications, safety, traffic continuity, and minimal impact on the surroundings.
Works · Open · European procedure
01What is being requested
The municipality A4 Zone West C.V. wishes to prepare the Imagination Avenue and the intersections with Airborne Avenue and Circular Avenue by performing a preloading operation, so that the actual construction of the roads and intersections causes minimal disruption at a later stage. After the preloading, it will be removed and the roads and intersections will be constructed according to the attached specifications. The contract concerns an open procedure for road construction works. The contractor must realize the preloading, its removal, and the subsequent construction of the roads and intersections, taking into account the requirements in the specifications, safety, traffic continuity, and minimal impact on the surroundings.
GEM A4 Zone West C.V. has preloaded the Imagination Avenue and the intersections with Airborne and Circular Avenue to minimize future settlement to a minimum. After this phase, the preloading will be removed and the roads and intersections will be constructed. The works are described in the present specifications.
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the specific scope of the works for the Imagination Avenue?
Which aspects must be taken into account during the realization of the roads and intersections?
Automatically compiled from the official tender data and documents.
07Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159