ClosedWorksCompetitive procedure with negotiation

Construction of James Cookstraat bridge and connecting roads.

Havenbedrijf Gent nv van publiek recht · Competitive procedure with negotiation · 1 lots · 212884
Type
Works
45221110
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Havenbedrijf Gent nv has launched a competitive procedure with negotiation for the construction of a bridge over an existing railway, including adjustments to the James Cookstraat and surrounding roads. The contract includes extensive preparatory works such as measurements, the removal of existing vegetation and paving, and the placement of temporary road signage. Earthworks, foundation construction, and the laying of 15,000 m² of bituminous paving for roads and cycle paths are required. Additionally, ditches, linear elements, retaining walls, and a retaining wall structure must be constructed. The bridge structure has a span of 20 m and a width of 15 m. Signage, markings, and road delineations conclude the works. The contract requires a combination of civil engineering, road construction, and railway applications, with attention to safety and minimal disruption to the existing railway.

Works · Competitive procedure with negotiation · National procedure

Contract type
Works
Competitive procedure with negotiation
Estimated value
Estimate not published
Submission deadline
Ongoing
08:40
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Gent
CharacteristicsCPV 45Worksbridge constructionpavingearthworks

01What is being requested

Havenbedrijf Gent nv has launched a competitive procedure with negotiation for the construction of a bridge over an existing railway, including adjustments to the James Cookstraat and surrounding roads. The contract includes extensive preparatory works such as measurements, the removal of existing vegetation and paving, and the placement of temporary road signage. Earthworks, foundation construction, and the laying of 15,000 m² of bituminous paving for roads and cycle paths are required. Additionally, ditches, linear elements, retaining walls, and a retaining wall structure must be constructed. The bridge structure has a span of 20 m and a width of 15 m. Signage, markings, and road delineations conclude the works. The contract requires a combination of civil engineering, road construction, and railway applications, with attention to safety and minimal disruption to the existing railway.

This contract mainly comprises: o All measurements and preparatory works to enable the construction works at the intended location o The breaking up and removal of existing vegetation, roads, and paving (at the level of the connection with the existing state) o The application of temporary road signage o All earthworks, both in excavation and embankment, including leveling and compaction, including dewatering if necessary. o Construction of foundations o Construction of bituminous paving for roads and cycle paths (order of magnitude 15,000 m²) o Construction of ditches o Construction of linea

45221110Works
1Lot 1

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9992×
2Combinatie Heijmans - SWARCOUnknown9973×
3Boskalis Nederland B.V.SME9970×
4BAM Infra B.V.SME9777×
5Dura Vermeer Infra Regionale Projecten BVSME9758×
6Heijmans Infra B.V.SME9765×

04Legal themes that may be relevant here

05Frequently asked questions

What are the main works of this contract?
The contract includes the construction of a bridge structure over an existing railway with a span of 20 meters and a width of 15 meters, including earthworks, foundations, the construction of ditches, and the laying of approximately 15,000 m² of bituminous paving for roads and cycle paths.
Which civil engineering elements are realized during the construction of the roads and the bridge?
In addition to the bridge and the bituminous paving, the contract includes the construction of linear elements, retaining walls, a retaining wall structure, ditches, and the application of signage, markings, and road delineation.
What preparatory works are expected during the construction of the James Cookstraat and the connecting roads?
The works begin with all necessary measurements and preparatory works, the breaking up and removal of existing vegetation, roads, and paving, and the application of temporary road signage.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159