Installation of 1,300 m sheet piling in Rozenburg
Havenbedrijf Rotterdam NV has issued a tender for the installation of a 1,300-meter-long sheet piling wall in Rozenburg. The sheet piling must be placed parallel to the Droespolderweg, within an existing pipeline corridor, to enable future expansions of cables and pipelines. A former railway embankment is located only 1.5 meters away, meaning the expansion can only be realized through a sheet piling construction that stabilizes the embankment, allowing part of the embankment to be excavated. The assignment includes participation in the construction team, the placement of the sheet piling, the installation of anchors over the entire length, and the excavation of the embankment. The procedure is a competitive procedure with negotiation, aimed at a reliable, technically competent, and financially stable company. The contracting authority expects a project with high safety and environmental standards, a clear schedule, and an integrated approach with the existing infrastructure.
Works · Competitive procedure with negotiation · European procedure
01What is being requested
Havenbedrijf Rotterdam NV has issued a tender for the installation of a 1,300-meter-long sheet piling wall in Rozenburg. The sheet piling must be placed parallel to the Droespolderweg, within an existing pipeline corridor, to enable future expansions of cables and pipelines. A former railway embankment is located only 1.5 meters away, meaning the expansion can only be realized through a sheet piling construction that stabilizes the embankment, allowing part of the embankment to be excavated. The assignment includes participation in the construction team, the placement of the sheet piling, the installation of anchors over the entire length, and the excavation of the embankment. The procedure is a competitive procedure with negotiation, aimed at a reliable, technically competent, and financially stable company. The contracting authority expects a project with high safety and environmental standards, a clear schedule, and an integrated approach with the existing infrastructure.
A pipeline corridor runs parallel to the Droespolderweg in Rozenburg. To accommodate future expansions regarding cables and pipelines, the pipeline corridor must be widened by several meters here. However, adjacent to this pipeline corridor, within approximately 1.5 m, lies a former railway embankment, which means the expansion must be realized through the application of a sheet piling construction in the embankment, so that part of the embankment can be excavated. The length of the route is approximately 1,350 m. The project scope consists of: Participating in the construction team; Install
02Exclusion grounds
- No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).
03Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
04Likely competitors
05Legal themes that may be relevant here
06Frequently asked questions
What is the exact scope of the works?
What is the purpose of the sheet piling construction in Rozenburg?
How must the contracting authority be supported during execution?
Automatically compiled from the official tender data and documents.