ClosedWorksOpen

ISW Extension, Construction Team

Stichting "Het Rijnlands Lyceum" · Open · 1 lots · 271157
Type
Works
45214220
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Stichting Het Rijnlands Lyceum (SHRL) is seeking a contractor for the construction of a new building and installation technology project at the Wassenaar location. The project, carried out on the basis of a DO+ (Design and Build) approach, has a construction budget of € 4,400,000 excl. VAT. The contractor must further develop the DO+ documents into execution documents (specifications) and must have already applied for the building permit. The procedure is public, ensuring all interested parties receive an equal opportunity. The assignment focuses on a school environment, which entails specific requirements regarding safety, sustainability, and functionality.

Works · Open · National procedure

Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
WASSENAAR
CharacteristicsCPV 45Worksconstructioninstallation technology worksDO+

01What is being requested

Stichting Het Rijnlands Lyceum (SHRL) is seeking a contractor for the construction of a new building and installation technology project at the Wassenaar location. The project, carried out on the basis of a DO+ (Design and Build) approach, has a construction budget of € 4,400,000 excl. VAT. The contractor must further develop the DO+ documents into execution documents (specifications) and must have already applied for the building permit. The procedure is public, ensuring all interested parties receive an equal opportunity. The assignment focuses on a school environment, which entails specific requirements regarding safety, sustainability, and functionality.

The assignment concerns the realization of building and installation technology works for SHRL location Wassenaar. The construction budget is € 4,400,000 excl. VAT. Construction and furnishing will be based on a DO+. The contractor must further develop the DO+ documents into execution documents (specifications). A building permit has already been applied for.

45214220Works
1Lot 1

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME9392×
2BAM Infra B.V.SME9377×
3Combinatie Heijmans - SWARCOUnknown9373×
4Dura Vermeer Infra Regionale Projecten BVSME9358×
5BAM Bouw en Techniek bvSME9134×
6BINX Smartility B.V.SME9027×

04Tender documents

Nota van Inlichtingen 3 Rijnlands - AanbouwdocxOct 11, 2022 · 47 KB
Nota van Inlichtingen 2 Rijnlands Lyceum Aanbouw ISW, BouwteamdocxOct 10, 2022 · 42 KB
Nota van Inlichtingen 1 Rijnlands - AanbouwpdfSep 27, 2022 · 76 KB
Bijlage 9 HoldingverklaringdocxSep 15, 2022 · 1999 KB
Bijlage 12 SRL-ISW-documentenlijstpdfSep 15, 2022 · 297 KB
Bijlage 2-SRL-ISW model aannemingsovereenkomstpdfSep 15, 2022 · 614 KB
Bijlage 8 Model K verklaringdocxSep 15, 2022 · 33 KB
TN375356 - SF14 Kennisgeving van aanvullende informatie, informatie over een onvolledige procedure of rectificatie 20220915171518pdfSep 15, 2022 · 13 KB
Bijlage 10 Bereidsheidsverklaring bankgarantiedocxSep 15, 2022 · 100 KB
Bijlage 7 Uniform Europees AanbestedingsdocumentpdfSep 15, 2022 · 2097 KB
Bijlage 11 Geheimhoudingsverklaring bouwteamdocxSep 15, 2022 · 27 KB
Bijlage 6 Format Nota van InlichtingendocxSep 15, 2022 · 34 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the nature of the execution of this assignment?
The realization of the building and installation technology works takes place on the basis of a DO+ (Design and Build) approach.
What tasks must the contractor perform regarding the DO+ documents?
The contractor must further develop the DO+ documents into execution documents (specifications).
What is the available construction budget for the extension?
The construction budget for the building and installation technology works amounts to € 4,400,000 excl. VAT.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159