AwardedServicesEuropeanOpen

42-2025 Engineering services for De Nieuwe Held

Type
Services
71300000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This document contains the conditions for the design of the public space by a developer for the Municipality of Groningen. It serves as an assessment framework for the design and execution of the works.

Services · Open · European procedure

European
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
10:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 71ServicesEU tender

01What is being requested

The Public Space Design Conditions (VIOR) set the requirements for the design of property by a developer, whereby the results must meet functional requirements, aspect requirements, and interface requirements for the public space.

The Municipality of Groningen intends to enter into a framework agreement for engineering services for ‘De Nieuwe Held’. The objective of this framework agreement is to deploy three technical roles within the project team of the Municipality of Groningen. The activities primarily consist of preparing various execution contracts for the development of the new residential area.

71300000Services

02Outcome

Awarded

Invra Plus B.V.

Bidders
4

03Strategic insight

Strategic insight · AI analysis
Ensure full verification of the design against the specific functional and aspect requirements. Take into account the proactive attitude expected by the municipality in the collaboration. Manage the responsibility for all third parties involved within the project.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 4
The developer is responsible for the interpretation of the information made available.Important
The framework conditions have a validity period of two years until the start of realization.Important
The developer must inform third parties, such as contractors and engineering firms, about these conditions.Important
The municipality performs random inspections of the works.Important

05Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

06Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

07Bidders in this segment

#Likely bidderFitWins
1Antea Nederland BVSME10077×
2Roelofs Advies en Ontwerp B.V.SME10027×
3Haskoning Nederland B.V.SME99129×
4RPS advies- en ingenieursbureau B.V.SME9938×
5Aveco de Bondt BVSME9919×
6Arcadis Nederland B.V.SME98151×

08Tender documents

TN524982 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250828152014pdfAug 29, 2025 · 9 KB
Tweede Nota van Inlichtingen Ingenieursdiensten De Nieuwe HeldpdfJun 11, 2025 · 84 KB
Nota van Inlichtingen Ingenieursdiensten De Nieuwe HeldpdfMay 28, 2025 · 118 KB
00 Offerteaanvraag Ingenieursdiensten De Nieuwe Held_nav NvI1pdfMay 28, 2025 · 1049 KB
10 Referentieformulier Ingenieursdiensten De Nieuwe Held_nav NVIdocxMay 28, 2025 · 34 KB
09 Uitkomsten Marktconsultatie De Nieuwe HeldpdfMay 9, 2025 · 328 KB
07 UEA Ingenieursdiensten De Nieuwe HeldpdfMay 9, 2025 · 308 KB
13 VIOR2025_V01_Compleet met VSE en VSPpdfMay 9, 2025 · 4745 KB
04 Addendum DNR 2011 gemeente GroningenpdfMay 9, 2025 · 529 KB
14B Handboek tekenwerk Autocad dd5okt2021 incl bijlagenpdfMay 9, 2025 · 14729 KB
01 PrijzenbladxlsxMay 9, 2025 · 50 KB
12 Faseringsplan de Nieuwe HeldpdfMay 9, 2025 · 12294 KB

09Legal themes that may be relevant here

10Frequently asked questions

What is the purpose of the framework agreement for engineering services?
The purpose of this framework agreement is to deploy three technical roles within the project team of the Municipality of Groningen for the ‘De Nieuwe Held’ project.
What do the activities for the engineering services entail?
The activities primarily consist of preparing various execution contracts for the development of the new residential area.
For which specific project are the engineering services being deployed?
The services are being deployed for the development of the new residential area named ‘De Nieuwe Held’.

Automatically compiled from the official tender data and documents.

11Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713