31910 Penitentiaire Inrichting Nieuwegein Replacement of existing fluorescent lighting with LED lighting
The Dutch procurement concerns the replacement of existing fluorescent lighting with LED lighting in the Penitentiaire Inrichting Nieuwegein (PI). The project focuses on a building of approximately 24,000 m² gross floor area, with a capacity of 500 detainees. In consultation with Dienst Justitiële Inrichtingen (DJI), it has been decided to replace the outdated indoor lighting to comply with energy and LED legislation.
Works · Restricted · National procedure
01What is being requested
The Dutch procurement concerns the replacement of existing fluorescent lighting with LED lighting in the Penitentiaire Inrichting Nieuwegein (PI). The project focuses on a building of approximately 24,000 m² gross floor area, with a capacity of 500 detainees. In consultation with Dienst Justitiële Inrichtingen (DJI), it has been decided to replace the outdated indoor lighting to comply with energy and LED legislation.
The Penitentiaire Inrichting (PI) Nieuwegein is characterized by a floor plan shaped like a double-sided chamber, architecturally a variant of the double cross, with an area of over 24,000 m² gross floor area (GFA). The PI is a facility with a capacity for nearly 500 detainees and four different regimes: Prison (Gevangenis), Remand Centre (Huis van Bewaring (HvB)), Institution for Systematic Offenders (Inrichting voor Stelselmatige Daders (ISD)), and Extra Care Provision (Extra Zorgvoorziening (EZV)). In consultation with Dienst Justitiële Inrichtingen (DJI), it has been decided to replace th
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Legal themes that may be relevant here
05Frequently asked questions
What is the size of the building where the lighting is being replaced?
Why was the decision made to replace the lighting?
For which regimes within PI Nieuwegein must the lighting be replaced?
Automatically compiled from the official tender data and documents.
06Estimated value versus the market
€ 1,4 mln
€ 3,6 mln
€ 9,1 mln
Gegunde waarden in CPV 45 · werken n=3159