ClosedWorksMarktconsultatie

31205558: Market Consultation Renewal of Van Brienenoordbrug

Rijkswaterstaat Grote Projecten en Onderhoud · Marktconsultatie · 1 lots · 361741
Type
Works
45221110
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Rijkswaterstaat is seeking a contractor for the market consultation regarding the Renewal of Van Brienenoordbrug. The objective is a partially renovated and partially replaced bridge that meets functional requirements for 100 years. The works include CE marking for the movable part, including new falls, installations, movement works, and civil engineering adjustments to piers and the basement in the eastern bridge, replacement of components for CE marking in the western bridge, and a new control system for the entire bridge. Additionally, a new western arch bridge must be realized and the current western arch bridge must be renovated to serve as a replacement for the eastern arch bridge. The assignment requires an integrated approach of civil engineering, mechanical systems, and digital control and monitoring infrastructure.

Works · Marktconsultatie · National procedure

Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksCE markingbridge renovationmarket consultation

01What is being requested

Rijkswaterstaat is seeking a contractor for the market consultation regarding the Renewal of Van Brienenoordbrug. The objective is a partially renovated and partially replaced bridge that meets functional requirements for 100 years. The works include CE marking for the movable part, including new falls, installations, movement works, and civil engineering adjustments to piers and the basement in the eastern bridge, replacement of components for CE marking in the western bridge, and a new control system for the entire bridge. Additionally, a new western arch bridge must be realized and the current western arch bridge must be renovated to serve as a replacement for the eastern arch bridge. The assignment requires an integrated approach of civil engineering, mechanical systems, and digital control and monitoring infrastructure.

The project result is a partially renovated and partially replaced Van Brienenoordbrug that will meet the intended functions for the next 100 years. This will be achieved by: [newline]• CE marking for the movable part of the bridge. This will be obtained by: [newline]o In the eastern bridge: newly realized falls, installations, movement works, and large-scale civil engineering adjustments to piers and the basement; [newline]o In the western bridge: replacing components for the purpose of CE marking; [newline]o For the entire bridge: new control, operation, and monitoring. [newline]• A newly r

45221110Works
131205558: Market Consultation Renewal of Van Brienenoordbrug

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2BAM Infra B.V.SME10077×
3Dura Vermeer Infra Regionale Projecten BVSME10058×
4Heijmans Infra B.V.SME10065×
5Combinatie Heijmans - SWARCOUnknown9973×
6Boskalis Nederland B.V.SME9969×

04Legal themes that may be relevant here

05Frequently asked questions

What is the objective of the renewal of the Van Brienenoordbrug?
The objective is a partially renovated and partially replaced Van Brienenoordbrug that will meet the intended functions for the next 100 years.
What works are required for the CE marking of the movable part?
For the eastern bridge, this concerns newly realized falls, installations, movement works, and civil engineering adjustments to piers and the basement. In the western bridge, components will be replaced, and for the entire bridge, new control, operation, and monitoring will be realized.
What is the intended structural change of the arch bridges?
A new western arch bridge will be realized, and the current western arch bridge will be renovated to serve as a replacement for the current eastern arch bridge.
Which disciplines are required for this project?
The assignment requires an integrated approach of civil engineering, mechanical systems, and digital control and monitoring infrastructure.

Automatically compiled from the official tender data and documents.

06Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159