OpenServicesEuropeanSME-friendlyOpen

31203547: Skid resistance execution contract Zeeland

Type
Services
90620000
Estimated value
Not published
To deadline
-154d
Jan 13, 2026 · 15:00
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Promising — consider biddingconfidence high

This tender concerns the coordination and execution of skid resistance in the Zeeland coordination area for the period 2026 to 2030.

Services · Open · European procedure · SME-friendly

SME-friendlyEuropeanComplete timeline
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
January 13, 2026
15:00
Scope
European
European procedure
Lots
7
7 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 90ServicesSME-friendlyEU tender

01What is being requested

The contract concerns the coordination and execution of the skid resistance within the Zeeland coordination area during the frost seasons in the period from 1 October 2026 to 1 May 2030.

The contractor must primarily perform the following works: Coordinating and executing the skid resistance within the Zeeland coordination area during the frost seasons in the period from 1 October 2026 to 1 May 2030. For the lots: Lot 1: Schouwen-Duiveland. Lot 2: Tholen, St. Philipsland and Oost Zuid-Beveland. Lot 3: Walcheren. Lot 4: West Zuid-Beveland and Noord Beveland. Lot 5: West Zeeuws Vlaanderen. Lot 6: Oost Zeeuws Vlaanderen. Lot 7: Motorway West (West Brabant)

90620000Services
1Lot 1: Schouwen-Duiveland
2Lot 2: Tholen, St. Philipsland and Oost Zuid-Beveland
3Lot 3: Walcheren
4Lot 4: West Zuid-Beveland and Noord-Beveland
5Lot 5: West Zeeuws Vlaanderen
6Lot 6: Oost-Zeeuws Vlaanderen
7Lot 7: Motorways West (West Brabant)

02Breakdown by lot

Lot 1: Schouwen-Duivelandn/a
Lot 2: Tholen, St. Philipsland and Oost Zuid-Bevelandn/a
Lot 3: Walcherenn/a
Lot 4: West Zuid-Beveland and Noord-Bevelandn/a
Lot 5: West Zeeuws Vlaanderenn/a
Lot 6: Oost-Zeeuws Vlaanderenn/a
Lot 7: Motorways West (West Brabant)n/a

Per-lot values not published — bars show only the lot breakdown.

03Strategic insight

Strategic insight · AI analysis
Ensure that the reference assignments exactly meet the sectoral requirements and cover the minimum amounts per lot. Check whether the quality management system complies with the specific ISO standard. Pay close attention to the digital signature of all mandatory PDF documents.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 5
The project management system must be based on a certified quality management system according to NEN-EN-ISO 9001.Important
Bids must be submitted exclusively digitally via TenderNed.Important
Documents that must be signed must be provided with a qualified electronic signature.Important
Submitting variants by the bidder is not permitted.Important
During a site visit, wearing personal protective equipment is mandatory.Important

05Can I take part?

Technical — In the five-year period prior to the deadline for receipt of tenders, having performed at least one assignment in the agricultural, landscaping, transport, or construction sector with an amount per lot in accordance with the subdivision.
Technical — In the five-year period prior to the deadline for receipt of tenders, having gained experience in combating skid resistance on the road network of a national or regional road manager.

06Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

07Process & timeline

Announcement
29-10-2025
Information meeting
11-11-2025
Request for further information
28-11-2025
Site visit
04-12-2025
Publication of notice of information
10-12-2025
Tender deadline
13-01-2026
Opening digital vault
14-01-2026
Award decision
09-02-2026
Standstill period
02-03-2026
Sending contract
10-03-2026

08Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

09Likely competitors

#Likely bidderFitWins
1SITA Recycling Services Noord B.V.SME9748×
2CSU B.V.SME95181×
3De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9315×
4Gladheidbestrijding Mainport Rotterdam B.V.SME82
5Van Doorn Geldermalsen B.V.SME8210×
6Fa. Gebr. Van der LeeUnknown80

10Tender documents

Nota van inlichtingen 2025-12-11-2pdfDec 11, 2025 · 9 KB
31203547 NvI versie 1pdfDec 11, 2025 · 521 KB
Presentatie Inlichtingen Gladheid Zeeland Versi 2 14-11-2025 defpptxNov 20, 2025 · 2923 KB
TN552881 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20251112154203pdfNov 12, 2025 · 33 KB
Bijlage E6 Inschrijvingsbiljet Perceel 6docxOct 31, 2025 · 24 KB
31203547 Bijlage 10 Perceel indeling RWS 17-10-2025 defpdfOct 31, 2025 · 56 KB
31203547 Bijlage 3 Richtlijnen toepassen dooimiddelen 17-10-2025 defpdfOct 31, 2025 · 150 KB
Bijlage D Gegevens omtrent technische geschiktheidseisendocxOct 31, 2025 · 29 KB
Bijlage B Aanvullende eigen verklaringdocxOct 31, 2025 · 31 KB
Bijlage C Model IndieningsformulierdocxOct 31, 2025 · 23 KB
31203547 Bijlage 5 Zeeland RWS Overzicht beheersgebied 17-10-2025 defpdfOct 31, 2025 · 2063 KB
31203547 Bijlage 7 Voorschriften samenstelling natte component 17-10-2025 defpdfOct 31, 2025 · 99 KB

11Legal themes that may be relevant here

12Frequently asked questions

What does the skid resistance assignment entail?
The assignment includes the coordination and execution of skid resistance within the Zeeland coordination area. This concerns combating skid resistance caused by condensation/moisture, snow, and ice on surfaces such as roads and cycle paths to ensure safety for road users.
What is the duration of the execution contract?
The works for skid resistance during the frost seasons are carried out in the period from 1 October 2026 up to and including 1 May 2030.
Which works fall under the definition of skid resistance?
The works consist of gritting actions (the spreading of de-icing agents in solid or liquid form) and plowing actions (the clearing of snow with a snow plow or roller broom), including the overall coordination of these activities.
What is the role of the contractor coordinator?
The contractor coordinator is the person designated and authorized by the contractor who is tasked with the skid resistance and acts as the first point of contact for the UAV management and/or the contracting authority coordinator.

Automatically compiled from the official tender data and documents.

13Estimated value versus the market

p25
€ 214K
median
€ 466K
p75
€ 1,2 mln
deze opdracht

Gegunde waarden in CPV 90 · diensten n=2216