31203484: Adjustment of sliding stops Oosterscheldekering phase 1
A large part of the sliding stops on the gates of the Oosterscheldekering must be addressed via replacement on 22 gates with great urgency in 2025. The works include revising the sliding stops, re-conserving the steel sockets, custom-making plastic guide blocks (counter-molds), and updating the spring elements. A large part of the sliding stops on the gates of the Oosterscheldekering must be addressed via replacement on 22 gates with great urgency in 2025. The works include revising the sliding stops, re-conserving the steel sockets, custom-making plastic guide blocks (counter-molds), and updating the spring elements. The contracting authority, Rijkswaterstaat Programma's, Projecten en Onderhoud, has a closed procedure without publication (works) around 28 budget amounts. No CPV code, value, or deadline has been specified, but the works for at least 12 gates are planned from 1 April 2025.
Works · Onderhandeling zonder bekendmaking · National procedure
01What is being requested
A large part of the sliding stops on the gates of the Oosterscheldekering must be addressed via replacement on 22 gates with great urgency in 2025. The works include revising the sliding stops, re-conserving the steel sockets, custom-making plastic guide blocks (counter-molds), and updating the spring elements. A large part of the sliding stops on the gates of the Oosterscheldekering must be addressed via replacement on 22 gates with great urgency in 2025. The works include revising the sliding stops, re-conserving the steel sockets, custom-making plastic guide blocks (counter-molds), and updating the spring elements. The contracting authority, Rijkswaterstaat Programma's, Projecten en Onderhoud, has a closed procedure without publication (works) around 28 budget amounts. No CPV code, value, or deadline has been specified, but the works for at least 12 gates are planned from 1 April 2025.
A large part of the sliding stops on the gates of the Oosterscheldekering require replacement. Recent research has shown that this must be addressed on 22 gates with great urgency. The scope of the project includes revising the sliding stops and revising the spring element on 22 gates of the Oosterscheldekering. The revision of the sliding stops concerns the re-conserving of the steel sockets and the custom-making ('planing') of the plastic guide blocks, the so-called counter-molds. For at least 12 gates, the execution works must take place in 2025, with the start of execution on 1 April 2025
02Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
03Likely competitors
04Frequently asked questions
What is the exact scope of the works at the Oosterscheldekering?
Which specific works fall under the revision of the sliding stops?
When must the works on the gates be carried out?
Is it possible to carry out works during the storm season?