AwardedWorksEuropeanOpen

31200067 Replacement of Current Guide Screens Brouwersspuisluis

Type
Works
45246200
Estimated value
€ 3,60M
awarded
To deadline
Ongoing
Knock-outs
0
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence high

This contract concerns the process-based management of the replacement of current guide screens at the Brouwersspuisluis under strict safety and quality conditions.

Works · Open · European procedure

European
Contract type
Works
Open
Estimated value
€3,600,000
awarded value
Submission deadline
Ongoing
15:00
Scope
European
European procedure
Lots
Single contract
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

The contract concerns the replacement of current guide screens at the Brouwersspuisluis, whereby the contractor is responsible for managing the works in accordance with the stated requirements.

The current current guide screens have been so severely affected by corrosion that holes have formed, meaning the function is no longer guaranteed. These holes are so large that even seals swim through them. [Note: translation of 'zeehonden' as seals]. [Note: The text provided contains a non-technical remark about seals]. [Note: The text provided contains a non-technical remark about seals]. [Note: The text provided contains a non-technical remark about seals]. [Note: The text provided contains a non-technical remark about seals]. [Note: The text provided contains a non-technical remark

45246200Works

02Outcome

Awarded

B.V. Aannemingsbedrijf De Klerk

Award value
€3,600,000
Bidders
3

03Strategic insight

Strategic insight · AI analysis
Ensure an integrated project management plan that aligns with the certified quality management system. Pay extra attention to the safety domains and the required certifications for personnel. Align the process descriptions closely with the specific requirements from the Request for Quotation.
Read automatically from the tender documents using AI. Always verify against the original documents.

04Points of attention

Important · 5
Execution works that may hinder the Oosterscheldekering are prohibited during the storm season.Important
The project management plan must contain the project organization, including management and key functions.Important
The contractor must appoint an execution phase coordinator in accordance with the Working Conditions Act (Arbeidsomstandighedenwet).Important
High-risk activities such as lifting and excavation may only take place between sunrise and sunset.Important
The contractor must organize a presentation and site visit at least 4 weeks before commencement.Important

05Can I take part?

Technical · 6
The contractor must comply with level 2 of the Safety Ladder Certification Scheme.Technical
The contractor must provide a valid SCL Certificate within 90 days after the award.Technical
Employees must have successfully completed the Rijkswaterstaat Safety Induction.Technical
Employees must have successfully completed the Generic Gate Instruction.Technical
Employees must possess a valid B-VCA certificate or equivalent.Technical
Operational supervisors must possess a valid VCA for operational supervisors certificate.Technical

06Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

07Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

08Bidders in this segment

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2ENGIE Infra & Mobility B.V.SME9969×
3Boskalis Nederland B.V.SME9769×
4Combinatie Heijmans - SWARCOUnknown9773×
5Ploegam B.V.SME9422×
6Van Oord Nederland BVSME9319×

09Tender documents

TN519701 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20251023125924pdfOct 24, 2025 · 10 KB
31200067 2e Nota van Inlichtingen 23.05.2025_gtkndpdfMay 23, 2025 · 166 KB
Nota van inlichtingen 2025-05-23-1pdfMay 23, 2025 · 24 KB
RWS-#4751016-v1-31200067 Documentenoverzicht Stroomgeleidingsschermen BrouwersspuisluispdfMay 23, 2025 · 265 KB
RWS-#4748555-v1-Bijlage I NVI - Format Concept staat van ontleding van de inschrijvingssomdocxMay 12, 2025 · 37 KB
31200067 1e Nota van Inlichtingen 12.05.2025 EVpdfMay 12, 2025 · 158 KB
Vergunningenscan GVO-Civiel Stroomgeleidingsschermen V2xlsxMay 12, 2025 · 16 KB
RWS-#4736346-v2A-31200067 Annexen bij VSP - StroomgeleidingsschermenpdfMay 12, 2025 · 675 KB
Bijlage G Uitwerking BPKV-criteria voor de beste prijs-kwaliteitverhouding_NvI 1pdfMay 12, 2025 · 18 KB
Nota van inlichtingen 2025-05-12-1pdfMay 12, 2025 · 60 KB
RWS-#4748562-v2-31200067 Wijzigingen VSEpdfMay 12, 2025 · 93 KB
TN519701 - EF16 Aankondiging van een opdracht - algemene richtlijn, standaardregeling 20250501165904pdfMay 1, 2025 · 9 KB

10Legal themes that may be relevant here

11Frequently asked questions

What is the exact scope of the contract for the Brouwersspuisluis?
The contract involves the replacement of the current guide screens that have been affected by corrosion and show holes, in order to restore and safeguard the flow-regulating functions of the Brouwersspuisluis.
Which management aspects must the contractor comply with?
The contractor must draw up plans for project management, quality management, integrated safety management (including emergency management and the safety ladder), risk management, scope management, planning management, and financial management.
What requirements are imposed on the handling of labor and services?
The contractor must comply with the Foreign Workers Employment Act (Wav) and the relevant employment condition provisions, including the duty to provide information, monitoring for underpayment, and the obligation to report wage claims (chain clause/kettingbeding).
Which control components are part of the project control?
Project control includes, among other things, drawing up an object tree and Work Breakdown Structure (WBS), drawing up a risk register, substantiating the contract sum, drawing up a progress report (termijnstaat), and performing CO2 reduction and environmental cost control.

Automatically compiled from the official tender data and documents.