ClosedWorksEuropeanSME-friendlyOpen

31198527 ROK Dynamic traffic management systems and Public lighting Design and Realisation (DOOR)

Type
Works
45315100
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Rijkswaterstaat utilizes a framework agreement for the improvement and renewal of Dynamic Traffic Management (DVM) and Public Lighting (OV) in the Netherlands. The project is divided into two regional lots (North and South) and includes the design, realisation, and adaptation of underlying infrastructure, communication, and power supply. The tender is public and follows the Best Price Quality Ratio (BPKV). The duration is three years with two optional extensions of one year each. Prices are determined based on unit prices. The contractor is involved from the project order until final settlement. The assignment requires an integrated approach to traffic and lighting systems, where one party is responsible per lot, but there is room for competition on work components.

Works · Open · European procedure · SME-friendly

SME-friendlyEuropean
Contract type
Works
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
17:00
Scope
European
European procedure
Lots
2
2 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksSME-friendlyEU tenderDynamic traffic managementPublic lightingFramework agreement

01What is being requested

Rijkswaterstaat utilizes a framework agreement for the improvement and renewal of Dynamic Traffic Management (DVM) and Public Lighting (OV) in the Netherlands. The project is divided into two regional lots (North and South) and includes the design, realisation, and adaptation of underlying infrastructure, communication, and power supply. The tender is public and follows the Best Price Quality Ratio (BPKV). The duration is three years with two optional extensions of one year each. Prices are determined based on unit prices. The contractor is involved from the project order until final settlement. The assignment requires an integrated approach to traffic and lighting systems, where one party is responsible per lot, but there is room for competition on work components.

The Contractor shall primarily perform the following works/services: * Improving and renewing (designing, realising, and converting/reallocating) - DVM; - OV; - underlying infrastructure; - communication; - power supply. * The Work is divided into 2 lots, based on the regional distribution of Rijkswaterstaat: - North: WNN + NN + ON + MN - South: WNZ + ZD +ZN * The contract will be a framework agreement with one party per lot, with the possibility of assigning work through competition; - Duration 3 years with two one-year options for extension - Components and works based on unit pr

45315100Works
131198527 WNN + NN + ON + MN
231198527 WNZ + ZD +ZN

02Breakdown by lot

31198527 WNN + NN + ON + MNn/a
31198527 WNZ + ZD +ZNn/a

Per-lot values not published — bars show only the lot breakdown.

03Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

04Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

05Likely competitors

#Likely bidderFitWins
1Combinatie Heijmans - SWARCOUnknown10073×
2Heijmans Infra B.V.SME10065×
3KWS Infra B.V.SME9992×
4Van Gelder BVSME9953×
5De Jong Zuurmond Infrabeheer, Onderhoud & Services B.V.SME9826×
6BAM Infra B.V.SME9777×

06Legal themes that may be relevant here

07Frequently asked questions

What is the scope of the works within this assignment?
The assignment includes the improvement, renewal, design, realisation, and conversion/reallocation of Dynamic Traffic Management (DVM), Public Lighting (OV), the underlying infrastructure, communication, and power supply.
What is the duration of the framework agreement?
The agreement has a duration of 3 years, with the possibility of two optional extensions of one year each.
In what manner does the award take place?
The assignment is awarded on the basis of the Best Price Quality Ratio (BPKV).
How are the prices within the agreement determined?
The components and the associated works are determined on the basis of unit prices.
How is the cooperation between the contractor and the contracting authority arranged?
The contractor is involved from the project order until the final settlement (discharge).

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159