ClosedWorksMarktconsultatie

31190013 Realisation contract Over-Bruggen for the Over-Bruggen project

Rijkswaterstaat Programma's, Projecten en Onderhoud · Marktconsultatie · 1 lots · 313048
Type
Works
45000000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Rijkswaterstaat, via the Programmes, Projects and Maintenance department, is conducting a market consultation for a realisation contract aimed at the preparation and execution of highly essential variable maintenance on 20 steel (movable) WNZ bridges, including associated concrete approach bridges. The assignment includes mapping, developing, and prioritizing maintenance measures to ensure the safety and availability of the bridges, and the actual execution thereof by Over_Bruggen. The procedure focuses on attracting suitable contractors with experience in complex bridge maintenance projects, where detailed planning, quality control, and safety management are essential. The market consultation offers a transparent and open selection procedure, aimed at finding a partner who is both technically and financially capable of meeting the stated requirements.

Works · Marktconsultatie · National procedure

Contract type
Works
Marktconsultatie
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
National
National procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45Worksbridge maintenancesteel WNZhighly essential

01What is being requested

Rijkswaterstaat, via the Programmes, Projects and Maintenance department, is conducting a market consultation for a realisation contract aimed at the preparation and execution of highly essential variable maintenance on 20 steel (movable) WNZ bridges, including associated concrete approach bridges. The assignment includes mapping, developing, and prioritizing maintenance measures to ensure the safety and availability of the bridges, and the actual execution thereof by Over_Bruggen. The procedure focuses on attracting suitable contractors with experience in complex bridge maintenance projects, where detailed planning, quality control, and safety management are essential. The market consultation offers a transparent and open selection procedure, aimed at finding a partner who is both technically and financially capable of meeting the stated requirements.

The Over-Bruggen Project is concerned with the preparation and execution of the highly essential variable maintenance on a total of 20 steel (movable) WNZ bridges, including concrete approach bridges, in order to ensure the safety and availability of these bridges. The assignment includes both mapping and developing the maintenance that is highly essential and must be carried out by Over_Bruggen, as well as the execution of the identified measures. [See market consultation document]

45000000Works
131190013 Realisation contract Over-Bruggen for the Over-Bruggen project

02Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

03Likely competitors

#Likely bidderFitWins
1Arcadis Nederland B.V.SME100116×
2Haskoning Nederland B.V.SME100103×
3Witteveen+Bos Raadgevende ingenieurs B.V.SME10064×
4Sweco Nederland B.V. SME10071×
5Antea Nederland BVSME10061×
6KWS Infra B.V.SME10092×

04Tender documents

RWS-#4420998-v3-31190013-Verslag_Marktconsultatie_Realisatieovereenkomst_Over-BruggenpdfNov 20, 2023 · 1691 KB
TN434022 - EF04 Vooraankondiging die alleen ter informatie wordt gebruikt - algemene richtlijn 20231026135334pdfOct 26, 2023 · 5 KB
Bijlage 2 BedoelingendocumentpdfOct 10, 2023 · 173 KB
Bijlage 1 Vragenlijst_antwoordformulierdocxOct 10, 2023 · 24 KB
TN434022 - EF04 Vooraankondiging die alleen ter informatie wordt gebruikt - algemene richtlijn 20231010165434pdfOct 10, 2023 · 5 KB
Markconsultatie Realisatiecontract Over-BruggenpdfOct 10, 2023 · 50 KB

05Legal themes that may be relevant here

06Frequently asked questions

What is the specific objective of the Over-Bruggen project?
The project focuses on the preparation and execution of the highly essential variable maintenance on a total of 20 steel (movable) WNZ bridges, including the associated concrete approach bridges, to ensure the safety and availability of these bridges.
What does the assignment for the realisation contract entail?
The assignment includes both mapping and developing the highly essential maintenance that must be carried out by Over_Bruggen, as well as the actual execution of the identified maintenance measures.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159