31187912: Emergency A7 Prinses Margriettunnel
This assignment from Rijkswaterstaat Grote Projecten en Onderhoud concerns the procurement of research and recovery planning for the A7 Prinses Margriettunnel emergency. The contracting authority first wishes to investigate the possibilities to allow traffic (limited) through as quickly as possible and to implement the resulting traffic measures. Subsequently, a research project into the cause and impact of the emergency, directed on behalf of the contracting authority, must be facilitated. Based on those data, a short-term and long-term recovery plan must be drawn up. The actual recovery works fall outside this procurement plan; these will be addressed in a subsequent plan. The contractor must therefore possess expertise in tunnel safety, traffic management, and emergency analysis, and must be able to coordinate quickly with Rijkswaterstaat and other involved authorities.
Works · Onderhandeling zonder bekendmaking · National procedure
01What is being requested
This assignment from Rijkswaterstaat Grote Projecten en Onderhoud concerns the procurement of research and recovery planning for the A7 Prinses Margriettunnel emergency. The contracting authority first wishes to investigate the possibilities to allow traffic (limited) through as quickly as possible and to implement the resulting traffic measures. Subsequently, a research project into the cause and impact of the emergency, directed on behalf of the contracting authority, must be facilitated. Based on those data, a short-term and long-term recovery plan must be drawn up. The actual recovery works fall outside this procurement plan; these will be addressed in a subsequent plan. The contractor must therefore possess expertise in tunnel safety, traffic management, and emergency analysis, and must be able to coordinate quickly with Rijkswaterstaat and other involved authorities.
The objective of this assignment concerns the procurement of primarily the following works: [newline]1. Investigation of possibilities to grant traffic (limited) passage as soon as possible and the application of the resulting (traffic) measures;[newline]2. Facilitating research into the cause and impact of the emergency, directed on behalf of the Contracting Authority;[newline]3. Drawing up a short-term and long-term recovery plan and, upon receipt of instructions from the Contracting Authority after the award, executing said plan.[newline]N.B.: The actual execution of the recovery works fro
02Outcome
Van Hattum en Blankevoort BV
03Value in context
04Bidders in this segment
05Legal themes that may be relevant here
06Frequently asked questions
What is the specific scope of this assignment?
Do the actual recovery works fall under this assignment?
What are the main activities regarding traffic?
Automatically compiled from the official tender data and documents.