ClosedServicesEuropeanOnderhandeling zonder bekendmaking

31187285.0001 - Additional works Calamity Prinses Margriettunnel

Rijkswaterstaat · Onderhandeling zonder bekendmaking · 1 lots · 346262
Type
Services
71335000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

Rijkswaterstaat (RWS) has experienced a calamity in the Prinses Margriet tunnel on the A7 near Sneek caused by a raised tunnel section, resulting in the temporary closure of the motorway. To stabilize the structure and map the underlying foundation issues nationally, a research trajectory has been initiated. Deltares, the current contractor, must perform additional investigations to determine the cause of the failure. The tender concerns services for performing these additional works, including analysis, reporting, and potentially advice for remedial measures. The procedure is a negotiated procedure without prior publication, aimed at a rapid and expert execution of the research.

Services · Onderhandeling zonder bekendmaking · European procedure

European
Contracting authority
Contract type
Services
Onderhandeling zonder bekendmaking
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 71ServicesEU tendercalamitytunnelfoundation issues

01What is being requested

Rijkswaterstaat (RWS) has experienced a calamity in the Prinses Margriet tunnel on the A7 near Sneek caused by a raised tunnel section, resulting in the temporary closure of the motorway. To stabilize the structure and map the underlying foundation issues nationally, a research trajectory has been initiated. Deltares, the current contractor, must perform additional investigations to determine the cause of the failure. The tender concerns services for performing these additional works, including analysis, reporting, and potentially advice for remedial measures. The procedure is a negotiated procedure without prior publication, aimed at a rapid and expert execution of the research.

Additional works Calamity Prinses Margriettunnel. Rijkswaterstaat was confronted with an incident. At the Prinses Margriettunnel in the A7 in the vicinity of Sneek, a tunnel section had risen, such that the motorway has been closed for an as yet undetermined period. Measures were taken to stabilize the structure. Parallel to the handling of the calamity of the A7 Prinses Margriet tunnel, RWS GPO has started a research trajectory to map the underlying foundation issues nationally. The current contractor Deltares has been commissioned to carry out the necessary investigations to determine the ca

71335000Services
1Research Prinses Margriettunnel

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1Haskoning Nederland B.V.SME97129×
2Antea Nederland BVSME9777×
3Arcadis Nederland B.V.SME96151×
4Sweco Nederland B.V. SME9695×
5Witteveen+Bos Raadgevende ingenieurs B.V.SME9688×
6Movares Nederland B.V.SME9666×

05Legal themes that may be relevant here

06Frequently asked questions

What is the reason for this assignment?
The assignment arose following an incident at the Prinses Margriettunnel on the A7 near Sneek, where a tunnel section rose and the motorway was closed.
What is the purpose of the additional works?
The works are necessary to complete the research into the cause of the failure at the Prinses Margriettunnel as thoroughly as possible and to map the underlying foundation issues nationally.
Which activities are carried out within the research trajectory?
The trajectory includes additional investigations to determine the cause of the failure, including analysis, reporting, and potentially advice for remedial measures.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 341K
median
€ 992K
p75
€ 6,5 mln
deze opdracht

Gegunde waarden in CPV 71 · diensten n=2713