31186549: Market Consultation Project Tunnel Renovations South Holland Portfolio 2 Drechttunnel with repeat order
Market consultation for the renovation of the Drechttunnel and the Sijtwendetunnel within the Project Tunnel Renovations South Holland. The assignment combines civil renovation, technical installation replacement, and multi-year maintenance via an investigation phase.
Works · Marktconsultatie · National procedure
01What is being requested
Renovation of the Drechttunnel and an intended repeat order for the Sijtwendetunnel. The assignment includes civil engineering works, the replacement of tunnel technical installations (TTI) and multi-year maintenance until 2039.
The goal of Project Tunnel Renovations South Holland (PTZ) is to ensure the availability and safety of the tunnels concerned. This market consultation concerns the renovation and multi-year maintenance of the Drechttunnel with a repeat order (Portfolio 2). This market consultation is explicitly for project managers and tender managers of potential contractors (civil engineering and IA).
02Strategic insight
Focus on developing a robust execution plan for the conversion slots to guarantee predictability. Ensure a strong methodology to minimize uncertainties in the variable part during the investigation phase. Emphasize the quality of the test environment and testing to meet the requirements of the contracting authority.
03Points of attention
04Can I take part?
05Award criteria
Focus on a reliable, predictable, and efficient approach to the closures, where measures demonstrate that a party is well-prepared with a robust execution plan.
Approach to reduce uncertainties so that the variable part becomes manageable and predictable, and how a fixed price is established at the end of the investigation phase.
Emphasis on timely, supported, and high-quality testing.
06Value in context
The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.
07Likely competitors
08Tender documents
09Legal themes that may be relevant here
10Frequently asked questions
What is the content of the basic assignment and the intended repeat order within Portfolio 2?
What strategy is being used for the conversion of the tunnels?
What is the current direction of thought regarding the BPKV criteria?
How is sustainability intended to be included in the assignment?
For which target group is this market consultation specifically intended?
Automatically compiled from the official tender data and documents.