ClosedWorksEuropeanRestricted

31167979 Realization project VenR Swing Bridges Afsluitdijk Den Oever

Rijkswaterstaat Grote Projecten en Onderhoud · Restricted · 1 lots · 333748
Type
Works
45221110
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence moderate

This project includes the renovation and partial replacement of the movable bridge, the lock and the operating installations of the Stevin complex Den Oever.

Works · Restricted · European procedure

European
Contract type
Works
Restricted
Estimated value
Estimate not published
Submission deadline
Ongoing
15:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

Realization of the renovation and replacement of the Movable Bridge, Lock and the associated Operating Systems of the Stevin complex Den Oever.

The swing bridges on the A7 on the Afsluitdijk near Den Oever are at the end of their service life and must be replaced. Works must also be carried out on the lock.

45221110Works
1V&R Den Oever

02Strategic insight

Strategic insight · AI analysis
Ensure close coordination with the outsourcing partner for the active network components of the IV network. Take into account the direct deliveries from the contracting authority for hardware such as the UWN and RNSS. Manage the nuisance periods accurately to minimize the impact on traffic.
Read automatically from the tender documents using AI. Always verify against the original documents.

03Points of attention

Important · 5
The substructure of the Movable Bridge remains maintained.Important
The bridge falls will be completely replaced by new bridge falls of the swing bridge type.Important
The Lock will be reused almost entirely in its current state.Important
Works must be carried out with minimal nuisance to shipping and road traffic.Important
For the Movable Bridge, CE declarations must be obtained.Important

04Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

05Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

06Likely competitors

#Likely bidderFitWins
1KWS Infra B.V.SME10092×
2Arcadis Nederland B.V.SME98116×
3Haskoning Nederland B.V.SME97100×
4Combinatie Heijmans - SWARCOUnknown9674×
5Witteveen+Bos Raadgevende ingenieurs B.V.SME9663×
6Boskalis Nederland B.V.SME9569×

07Tender documents

TN460659 - EF29 Aankondiging gegunde opdracht - algemene richtlijn, standaardregeling 20250926134640pdfSep 28, 2025 · 10 KB
Nota van inlichtingen 2024-07-18-1pdfJul 18, 2024 · 7 KB
uea_460659_20240613095642pdfJun 23, 2024 · 1668 KB
Vraagspecificatie Proces BijlagenzipJun 23, 2024 · 98164 KB
31167979 Aanbestedingsleidraad bijlagenzipJun 23, 2024 · 221 KB
Vraagspecificatie Proces Gerefereerde documentenzipJun 23, 2024 · 16897 KB
31167979 AanbestedingsleidraadpdfJun 23, 2024 · 1804 KB
31167979 - Documentenlijst_dd 19-6-2024xlsxJun 23, 2024 · 39 KB
Annexen XIII - TMzipJun 23, 2024 · 262266 KB
Bijlage A - OntwerpdocumentenzipJun 23, 2024 · 140556 KB
Annex XV - Bijlage AzipJun 23, 2024 · 736 KB
Referentiedocumenten VSE deel IIzipJun 23, 2024 · 112309 KB

08Legal themes that may be relevant here

09Frequently asked questions

What is the scope of the works for the swing bridges near Den Oever?
The works include the replacement of bridge falls including drive, the adjustment of center and support piers, the installation of walkways between piers, the replacement of approach bridges, the realization of a maintenance path and (bicycle) crossing, and the replacement of operation, control and field installations such as signals, cameras, etc.
Which works are being carried out on the lock?
For the lock, it concerns the replacement of the operation (hardware and software) and control (software), including integration with existing field installations. In addition, building works will be carried out on buildings on the lock premises for maintenance and sustainability, and a storage facility for lock gates will be realized.
Which building works are planned for the bridge building?
The works on the bridge building consist of maintenance, sustainability and the realization of a new technical room.
Which themes are the focus within the project management of this assignment?
Project management focuses on drafting a project management plan, applying quality management, integrated safety management (including emergency management and an integrated safety dossier), the safety ladder and machine safety.

Automatically compiled from the official tender data and documents.

10Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159