ClosedWorksEuropeanAndere procedure in één fase

1-W-12472-21: Filling in Rijnhaven voluntary transparency

Gemeente Rotterdam · Andere procedure in één fase · 1 lots · 368643
Type
Works
45112000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The project concerns a change in the execution of the filling in of the Rijnhaven by the Municipality of Rotterdam. The approach to processing sand has been adjusted, as previous measurement results show that the original approach imposes too many obstructions on the surrounding area. The new approach requires additional removal of quay furniture, temporary extension of sewer outlets, and the direct placement of sand at the final location, including riprap at the water'edge. This change became necessary due to the planning of the zoning plan.

Works · Andere procedure in één fase · European procedure

European
Contracting authority
Contract type
Works
Andere procedure in één fase
Estimated value
Estimate not published
Submission deadline
Ongoing
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Netherlands
CharacteristicsCPV 45WorksEU tender

01What is being requested

The project concerns a change in the execution of the filling in of the Rijnhaven by the Municipality of Rotterdam. The approach to processing sand has been adjusted, as previous measurement results show that the original approach imposes too many obstructions on the surrounding area. The new approach requires additional removal of quay furniture, temporary extension of sewer outlets, and the direct placement of sand at the final location, including riprap at the water'edge. This change became necessary due to the planning of the zoning plan.

During the execution of contract 1-W-12472-21, measurement results have shown that the ongoing filling in of the Rijnhaven has more influence on adjacent properties in the surrounding area in some parts than previously expected. This has resulted in a different approach for processing the final quantities of sand. The original approach was to apply these to the current filling and process them later at the final position; this must now take place directly at the final location where the Rijnhavenpark will later be realized. It specifically means the following works: • Due to the enlargement

45112000Works
11-W-12472-21: Filling in Rijnhaven voluntary transparency

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for werken is € 5,54 M, for reference.

04Likely competitors

#Likely bidderFitWins
1Boskalis Nederland B.V.SME10069×
2Heijmans Infra B.V.SME9965×
3KWS Infra B.V.SME9892×
4BAM Infra B.V.SME9877×
5ENGIE Infra & Mobility B.V.SME9769×
6Dura Vermeer Infra Regionale Projecten BVSME9658×

05Legal themes that may be relevant here

06Frequently asked questions

What is the reason for the changed approach regarding the filling in of the Rijnhaven?
Measurement results have shown that the filling in has more influence on adjacent properties in the surrounding area in some parts than previously expected. Consequently, the approach for processing the final quantities of sand has been adjusted to limit obstructions for the surroundings.
What does the new method for sand processing entail?
Instead of first applying the sand to the current filling for later processing, the sand will now be applied directly to the final location where the Rijnhavenpark will later be realized. This prevents the sand from having to be placed in an intended depot on the current filling.
What specific works are required due to the changed approach?
The change includes the removal of more quay furniture (wooden purlins), the temporary extension of functioning overflows and sewer outlets running through the quay, and providing the water's edge with riprap to prevent erosion when laying the sand directly.
What role does the planning of the zoning plan play in this change?
The modified approach has become possible because more clarity has emerged regarding the planning of relevant project components, such as the zoning plan.

Automatically compiled from the official tender data and documents.

07Estimated value versus the market

p25
€ 1,4 mln
median
€ 3,6 mln
p75
€ 9,1 mln
deze opdracht

Gegunde waarden in CPV 45 · werken n=3159