1-D-32194-21: installation and rental of temporary school building at the Vander Duijn van Maasdamweg

Gemeente Rotterdam · Open · 1 lots · 250450
Type
Services
70310000
Estimated value
Not published
To deadline
Ongoing
Knock-outs
n/a
exclusion grounds
Award basis
Best price-quality ratio
Assess manuallyconfidence low

The Municipality of Rotterdam has an open tender for the installation, rental, and removal of a temporary school building of approximately 1,000 m² in Park 16Hoven. The building must be operational after the 2022 summer holidays, no later than 5 August 2022, with a construction period of approximately three months starting in mid-April or early May 2022. The rental agreement is for two years, from 5 August 2022 to 31 July 2024, without the possibility of termination. The contractor must ensure full delivery, installation, rental, and final removal of the building, including all necessary permits, safety measures, and logistical support.

Services · Open · European procedure

European
Contracting authority
Contract type
Services
Open
Estimated value
Estimate not published
Submission deadline
Ongoing
12:00
Scope
European
European procedure
Lots
1
1 lots
Main CPV code
Location
Rotterdam
CharacteristicsCPV 70ServicesEU tendertemporary school buildingPark 16HovenRotterdam

01What is being requested

The Municipality of Rotterdam has an open tender for the installation, rental, and removal of a temporary school building of approximately 1,000 m² in Park 16Hoven. The building must be operational after the 2022 summer holidays, no later than 5 August 2022, with a construction period of approximately three months starting in mid-April or early May 2022. The rental agreement is for two years, from 5 August 2022 to 31 July 2024, without the possibility of termination. The contractor must ensure full delivery, installation, rental, and final removal of the building, including all necessary permits, safety measures, and logistical support.

The Assignment concerns the installation, rental, and removal of a temporary school in Park 16Hoven Rotterdam. The starting point is that the school of approximately 1,000 m² can be taken into use immediately after the 2022 summer holidays (22 August). Two weeks are assumed for the move-in. Consequently, delivery must take place no later than Friday 5 August 2022. Assuming a construction period of approximately 3 months, construction must start in mid-April/early May 2022. The Rental Agreement lasts two (2) years. The start date of the Rental Agreement is expected to be 5-8-2022, and the Renta

70310000Services
1Lot 1

02Exclusion grounds

Exclusion grounds — consult the ESPD
  • No specific exclusion grounds were extracted. In a European tender, the mandatory and discretionary grounds of art. 2.86/2.87 of the Dutch Procurement Act almost always apply — check the European Single Procurement Document (ESPD).

03Value in context

Estimate not published

The contracting authority did not publish an estimated value — common for a large share of contracts. The EU threshold for diensten is € 221.000, for reference.

04Likely competitors

#Likely bidderFitWins
1GKB Realisatie B.V.SME8216×
2Primakabin B.V.SME80
3Den Ouden Aannemingsbedrijf B.V.SME7816×
4Van Doorn Geldermalsen B.V.SME7812×
5Directbouw B.V.SME77
6Daiwa House Modular Europe Jan Snel B.V.SME77

05Tender documents

TN345706 - SF02 Aankondiging van een opdracht 20220126150118pdfJan 26, 2022 · 30 KB

06Legal themes that may be relevant here

07Frequently asked questions

What is the size of the temporary school building?
The assignment concerns the installation, rental, and removal of a temporary school of approximately 1,000 m².
What is the expected construction period and when must delivery take place?
The construction period is approximately 3 months, whereby construction must start in the second half of April or the beginning of May 2022. Delivery must have taken place no later than Friday 5 August 2022.
What is the duration of the rental agreement?
The rental agreement has a duration of two years. The agreement is expected to start on 5 August 2022 and ends automatically on 31 July 2024 without termination being required.
What does the assignment entail for the contractor?
The contractor is responsible for the full delivery, installation, rental, and the final removal of the building, including arranging all necessary permits, safety measures, and logistical support.

Automatically compiled from the official tender data and documents.

08Estimated value versus the market

p25
€ 380K
median
€ 857K
p75
€ 2,4 mln
deze opdracht

Gegunde waarden in CPV 70 · diensten n=131